Ensuring Proper Concrete Temperature with ASTM C1064 Guidelines

Concrete is a crucial construction material, and its quality relies on factors like temperature during mixing and placing. This article elucidates the procedure for testing fresh concrete temperature in accordance with ASTM C1064 standards.

Fresh Concrete Temperature Testing Apparatus

The apparatus for testing fresh concrete temperature comprises:

1. Container

Choosing an appropriately sized container is vital. It should maintain a minimum 3-inch gap between its sides and the thermometer. The container depth ought to be three times the length of the largest aggregate, adhering to this simple rule for optimal testing accuracy.

2. Thermometer

A thermometer capable of measuring temperatures ranging from 30°F to 120°F is necessary. Submerge it at least 3 inches into the concrete, ensuring a calibrated accuracy of ±1°F. Calibration before each test is essential.

3. Scoop or Shovel

Select a scoop or shovel suitable for mixing concrete, ensuring it gathers a representative concrete sample.

Procedure for Testing Fresh Concrete Temperature (ASTM C1064)

  1. Concrete Sampling and Mixing:
  2. Sampling follows ASTM C172 standards, ensuring a well-mixed sample representative of the entire batch.

  3. Thermometer Placement:
  4. Insert the thermometer into the mixed concrete, maintaining a 3-inch distance from the container’s sides. The stem should be completely immersed in the mix. Any gaps between the thermometer and concrete should be minimized to prevent temperature reading alterations.

  5. Waiting Period:
  6. Depending on the nominal aggregate size, wait for 2 to 5 minutes for mixes with aggregates less than 3 inches, and 20 minutes for larger aggregates, allowing the temperature to stabilize. Record the temperature to the nearest 1°F.

  7. Post-Test Measures:
  8. Avoid temperature readings after removing the thermometer. Record the reading, clean the thermometer, and prepare it for subsequent tests.

Concrete Temperature Limits

ASTM C1064-86 stipulates a temperature range of 26.7°C to 35°C for concrete. Project specifications may modify these limits. Deviating from these temperature guidelines during pouring can result in various issues, such as:

High Internal Temperature:

  • False compressive strength values
  • Rapid setting
  • Urgent finishing requirements
  • Loss of entrained air
  • Cracks due to quick evaporation

Low Internal Temperature (Below 25°F):

  • Highly brittle product
  • Reduced curing and strength-gain rates
  • Cracks due to freezing and thawing

Understanding and adhering to these testing procedures and temperature limits are critical for ensuring the quality and durability of the constructed concrete.